  5. The calculation method of attractiveness generalized indicator of projects for construction the unmanned aircraft technique for civil applications

The calculation method of attractiveness generalized indicator of projects for construction the unmanned aircraft technique for civil applications

D.N. Kritsky
Annotations languages:

In this article, we propose a method of calculation of the indicator of the attractiveness of projects for construction of unmanned aircraft technology (BAT) civil purposes is based on the classification of design alternatives on the classic, special, record, unreliable, impractical, using the equation of the mass balance of the BAT; the analysis of technical and economic parameters of the project and the clipping of the alternatives, using the principles of "lean production"; rank and obtain the generalized indicator of the attractiveness of projects on the basis of utility theory.
Keywords: dichotomie tree, the equation of mass balance, the technical-economic indicators of the project, utility theory